Preventive measure of structural strengthening

Preventive measure of structural strengthening: CFRP strengthening, steel plate strengthening, post installed anchoring.


Preventive measure of structural strengthening


Item

Common problems

Preventive measure
Post installed anchor

The glue is not full enough; the distance between the steel bar and the hole wall is uneven

Glue injecting gun is used to post installed anchor, and two times correction is made after steel bar is implanted. The length of exposed steel bar is reasonably reserved, and the difficulty of planting bar is reduced.
Externally bonded CFRP wrapThe bond is not firm; carbon fiber cloth is not soaked; hollowing, etc.

Strengthen the grinding of the base and brush the primer glue.

The carbon fiber cloth is soaked with carbon fiber adhesive glue and then paste.

Roll along the same direction, carbon fiber selvage suitable for more glue.

Pate steel plate

Hollowing

The steel plate and the concrete surface are evenly coated with steel plate adhesive.

Strictly control the thickness of the steel plate glue.

Pressure perfusion glue is used for construction.


Horse Construction Recommended Products

You can find anything here you are in need of, have a trust trying on these products, you will find the big difference after that.

HM-20 Unidirectional Carbon Fiber Wrap

High strength, unidirectional carbon fiber wrap pre-saturated to form a carbon fiber reinforced polymer (CFRP) wrap used to strengthen structural concrete elements.

See more >

HM-500 Epoxy Anchoring

two-components modified epoxy resin adhesive, with high quality plastic tube, double cartridge package

See more >

HM-120 Steel Bonding Adhesive

Two-component epoxy modified epoxy structural strengthening adhesive for bonded steel plate to concrete

See more >

Back
Top
Close